Installation

1. Measuring the width of the road

2. Levelling out the ground

3. Digging in the start

4. Installing the first two panels

5. Panel assembly

6. Onsite installation of pins and plates

7. Just installed

8. In use

9. After 6 months

Tips and Tricks!

Please view our TrackPad Tips and Tricks

Installation Equipment

  • Personal protective equipment as required
  • Rubber mallets – suggest x 4 (do not use claw hammers)
  • Shovels, rakes, measuring tape and crowbar

Instruction Videos

Installation Using Speed Bolts

TrackPad Installation